2020-03-28
Specification for loading, unloading and storage of BWFRP pipes
To standardize the loading, unloading, and storage order of pipes on the construction site, ensure transportation and construction safety, control and prevent the occurrence of various problems
The following specifications are made for the handling, loading, unloading, and storage of BWFRP pipelines
Specification and requirements for loading and unloading of BWFRP pipes
A - Carefully inspect the vehicle to ensure that there are no oil stains or other dirt on the floor
B-Lower level staggered loading, strictly prohibited from being too large at the top and too small at the bottom or tilting
During the loading process, pay attention to the safety of people and goods, avoid smashing or getting stuck in the pipe mouth (gloves and helmets are required for operation)
4. Corresponding protective measures should be taken at the contact position with the pipeline (isolation protection should be done between the two sections to prevent pipeline collision and damage)
5. Check the pipeline binding, take rainproof measures, and confirm that the vehicle is 100% safe before driving away
6. During the unloading process, avoid the front gate from falling vertically and hitting the ground